Availability: | |
---|---|
Dragon Stage
packing weight:3100kg
packing volume:22cbm
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
16.00 m Beam(front) | 3 sets | 3.00 m | 50×3.0 | CS389×389 | 9pcs | |||
2.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
1.00 m | 50×3.0 | CS389×389 | 3pcs | |||||
20.00 m Beam(side) | 2 sets | 3.00 m | 50×3.0 | CS389×389 | 12pcs | |||
2.00 m | 50×3.0 | CS389×389 | 2pcs | |||||
1.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
7.00 m Pillar | 6 sets | 3.00 m | 50×3.0 | CS389×389 | 12pcs | |||
2.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
1.00 m | 50×3.0 | CS389×389 | 6pcs | |||||
Frame Tower | Spigot Sleeve Block S | 6pcs | ||||||
Steel Base S | 6pcs | |||||||
Top Section S | 6pcs | |||||||
Manual hoist,BA05 2Tons | 6pcs | |||||||
Spigot Hinge Section,Height 1m | 6pcs | |||||||
Fibre sling,BA04,2 tons 3m | 6pcs | |||||||
Long outrigger | 24pcs | |||||||
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
Roof Pillar | 3 sets | 1.60 m | 50×3.0 | CS289×289 | 3pcs | |||
20.00 m Top Beam | 1 sets | 3.00 m | 50×3.0 | CS289×289 | 6pcs | |||
2.00 m | 50×3.0 | CS289×289 | 1pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
8.20 m Oblique Beam | 6 sets | 3.00 m | 50×3.0 | CS289×289 | 12pcs | |||
2.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
2.20 m | 50×3.0 | CS289×289 | 6pcs | |||||
8.20 m Ladder truss | 16 sets | 3.00 m | 50×3.0 | CL30,289*50 | 32pcs | |||
2.00 m | 50×3.0 | CL30,289*50 | 0pcs | |||||
2.20 m | 50×3.0 | CL30,289*50 | 16pcs | |||||
Roof Components | roof conner 4 ways, use for roof beam truss | CS289×289 | 2pcs | |||||
roof conner 5 ways, use for roof beam truss | CS289×289 | 1pcs | ||||||
Connect plate with clamp | 3pcs | |||||||
Single clamp | 32pcs | |||||||
Double clamp | 12pcs | |||||||
roof canopy material:pvc, Blue Colour or customized. | 462.56 | 1pcs |
packing weight:3100kg
packing volume:22cbm
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
16.00 m Beam(front) | 3 sets | 3.00 m | 50×3.0 | CS389×389 | 9pcs | |||
2.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
1.00 m | 50×3.0 | CS389×389 | 3pcs | |||||
20.00 m Beam(side) | 2 sets | 3.00 m | 50×3.0 | CS389×389 | 12pcs | |||
2.00 m | 50×3.0 | CS389×389 | 2pcs | |||||
1.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
7.00 m Pillar | 6 sets | 3.00 m | 50×3.0 | CS389×389 | 12pcs | |||
2.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
1.00 m | 50×3.0 | CS389×389 | 6pcs | |||||
Frame Tower | Spigot Sleeve Block S | 6pcs | ||||||
Steel Base S | 6pcs | |||||||
Top Section S | 6pcs | |||||||
Manual hoist,BA05 2Tons | 6pcs | |||||||
Spigot Hinge Section,Height 1m | 6pcs | |||||||
Fibre sling,BA04,2 tons 3m | 6pcs | |||||||
Long outrigger | 24pcs | |||||||
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
Roof Pillar | 3 sets | 1.60 m | 50×3.0 | CS289×289 | 3pcs | |||
20.00 m Top Beam | 1 sets | 3.00 m | 50×3.0 | CS289×289 | 6pcs | |||
2.00 m | 50×3.0 | CS289×289 | 1pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
8.20 m Oblique Beam | 6 sets | 3.00 m | 50×3.0 | CS289×289 | 12pcs | |||
2.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
2.20 m | 50×3.0 | CS289×289 | 6pcs | |||||
8.20 m Ladder truss | 16 sets | 3.00 m | 50×3.0 | CL30,289*50 | 32pcs | |||
2.00 m | 50×3.0 | CL30,289*50 | 0pcs | |||||
2.20 m | 50×3.0 | CL30,289*50 | 16pcs | |||||
Roof Components | roof conner 4 ways, use for roof beam truss | CS289×289 | 2pcs | |||||
roof conner 5 ways, use for roof beam truss | CS289×289 | 1pcs | ||||||
Connect plate with clamp | 3pcs | |||||||
Single clamp | 32pcs | |||||||
Double clamp | 12pcs | |||||||
roof canopy material:pvc, Blue Colour or customized. | 462.56 | 1pcs |
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997