Availability: | |
---|---|
Dragon Stage
packing weight: 3200kg
packing volume: 7cbm
NO. | Item | Specification | Quantity |
1 | Layer truss | Horizontal Pipe, LR2,L:2M | 151 pcs |
2 | Diagonal Pipe, LR3,L:2.44M | 113 pcs | |
3 | Pillar,LR1, L:2m | 66 pcs | |
4 | adjustable base,LR4, H:0.25m | 18 pcs | |
5 | steel braces, L:2M,H:0.5M | 10 pcs | |
6 | Manual hoist,T1 | 5 pcs | |
7 | Fibre slings,T4 | 5 pcs | |
8 | CS40, square truss 389*389*2500mm | 5 pcs | |
9 | Double clamp | 20 pcs |
packing weight: 3200kg
packing volume: 7cbm
NO. | Item | Specification | Quantity |
1 | Layer truss | Horizontal Pipe, LR2,L:2M | 151 pcs |
2 | Diagonal Pipe, LR3,L:2.44M | 113 pcs | |
3 | Pillar,LR1, L:2m | 66 pcs | |
4 | adjustable base,LR4, H:0.25m | 18 pcs | |
5 | steel braces, L:2M,H:0.5M | 10 pcs | |
6 | Manual hoist,T1 | 5 pcs | |
7 | Fibre slings,T4 | 5 pcs | |
8 | CS40, square truss 389*389*2500mm | 5 pcs | |
9 | Double clamp | 20 pcs |
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997
Copyright © 2020 FOSHAN DRAGON STAGE EQUIPMENT CO.,LTD 备案号:粤ICP备2020113505号