logo
banner_news
You are here: Home » About Us » News
News List
March 12, 2022

Aluminum alloy scaffolding1. All parts of the aluminum alloy scaffold are made of special aluminum alloy, which is 75% lighter than the traditional steel frame2. High connection strength of components: Using a new type of cold working process of internal expansion and external pressure, the breaking

June 12, 2021

Aluminum alloy scaffolding in the environment of prosperous construction production, in line with the local policy implementation standards, in line with the safety department of the audit standards, in line with the construction standards of the building materials industry is particularly important

June 02, 2021

● The maximum bearing capacity of the top platform is 200Kg/㎡, and the maximum bearing capacity of the tower (including its own weight) is 1000kg.● Aluminum alloy tower has different height combination form: working table height from 2.5 meters to 13.1 meters range can choose different assembly form

March 31, 2021

General of aluminum scaffolding The general structure of aluminum scaffolding is a combination of "building blocks", with standardized components and no loose parts. If there is no assembly tool, two employees can build a 20-meter-high mobile working platform at a very short time. The scaffolding pa

FOSHAN DRAGON STAGE 

No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.

 +86  136 3132 8997

QUICK LINKS

PRODUCT LIST

Copyright © 2020 FOSHAN DRAGON STAGE EQUIPMENT CO.,LTD  备案号:粤ICP备2020113505号