features: | |
---|---|
Availability: | |
Dragon Stage
packing weight:900kg
packing volume:7cbm
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
8.00 m Beam(front) | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
2.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
6.00 m Beam(side) | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
2.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
5.00 m Pillar | 4 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
2.00 m | 50×3.0 | CS289×289 | 4pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
beam cube | Spigotcube 289x289 | 0pcs | ||||||
Frame Tower | Spigot Sleeve Block S | 4pcs | ||||||
Steel Base S | 4pcs | |||||||
Top Section S | 4pcs | |||||||
Manual hoist,BA05 2Tons | 4pcs | |||||||
Spigot Hinge Section,Height 1m | 4pcs | |||||||
Fibre sling,BA04,2 tons 3m | 4pcs | |||||||
Long outrigger | 16pcs |
0.4-0.6m | 0.6-1m | 1-1.5m | 1.5-2m | |
packing weight: | 1400kg | 1470kg | 1650kg | 1750kg |
packing volume: | 6.5cbm | 6.8cbm | 7cbm | 7.2cbm |
Item | Specification | Quantity | |||
steel assembly stage | topping: 4x8ft (1.22x2.44m) | wooden | 15 pcs | ||
LR01,pillar and inner tube | L= | 1.40m | 24 pcs | ||
LR02,horizontal pipe,length:8ft | 18 pcs | ||||
LR02,horizontal pipe,length:4ft | 20 pcs | ||||
Fork | 24 pcs | ||||
clamp | 18 pcs | ||||
Stage adjustable base | 24 pcs | ||||
Stage Stair | wooden topping | total | 3 | steps | 2 pcs |
2m high stage
Item | Specification | Quantity | |||
steel assembly stage | topping: 4x8ft (1.22x2.44m) | wooden | 15 pcs | ||
LR01,pillar and inner tube | L= | 1.40m | 24 pcs | ||
LR02,horizontal pipe,length:8ft | 36 pcs | ||||
LR02,horizontal pipe,length:4ft | 40 pcs | ||||
LR03,diagonal pipe(long side) | L= | 2.81 | 6 pcs | ||
LR03,diagonal pipe(short side) | L= | 1.86 | 10 pcs | ||
Fork | 24 pcs | ||||
clamp | 18 pcs | ||||
Stage adjustable base | 24 pcs | ||||
Stage Stair | wooden topping | total | 8 | steps | 2 pcs |
packing weight:900kg
packing volume:7cbm
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
8.00 m Beam(front) | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
2.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
6.00 m Beam(side) | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
2.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
5.00 m Pillar | 4 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
2.00 m | 50×3.0 | CS289×289 | 4pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
beam cube | Spigotcube 289x289 | 0pcs | ||||||
Frame Tower | Spigot Sleeve Block S | 4pcs | ||||||
Steel Base S | 4pcs | |||||||
Top Section S | 4pcs | |||||||
Manual hoist,BA05 2Tons | 4pcs | |||||||
Spigot Hinge Section,Height 1m | 4pcs | |||||||
Fibre sling,BA04,2 tons 3m | 4pcs | |||||||
Long outrigger | 16pcs |
0.4-0.6m | 0.6-1m | 1-1.5m | 1.5-2m | |
packing weight: | 1400kg | 1470kg | 1650kg | 1750kg |
packing volume: | 6.5cbm | 6.8cbm | 7cbm | 7.2cbm |
Item | Specification | Quantity | |||
steel assembly stage | topping: 4x8ft (1.22x2.44m) | wooden | 15 pcs | ||
LR01,pillar and inner tube | L= | 1.40m | 24 pcs | ||
LR02,horizontal pipe,length:8ft | 18 pcs | ||||
LR02,horizontal pipe,length:4ft | 20 pcs | ||||
Fork | 24 pcs | ||||
clamp | 18 pcs | ||||
Stage adjustable base | 24 pcs | ||||
Stage Stair | wooden topping | total | 3 | steps | 2 pcs |
2m high stage
Item | Specification | Quantity | |||
steel assembly stage | topping: 4x8ft (1.22x2.44m) | wooden | 15 pcs | ||
LR01,pillar and inner tube | L= | 1.40m | 24 pcs | ||
LR02,horizontal pipe,length:8ft | 36 pcs | ||||
LR02,horizontal pipe,length:4ft | 40 pcs | ||||
LR03,diagonal pipe(long side) | L= | 2.81 | 6 pcs | ||
LR03,diagonal pipe(short side) | L= | 1.86 | 10 pcs | ||
Fork | 24 pcs | ||||
clamp | 18 pcs | ||||
Stage adjustable base | 24 pcs | ||||
Stage Stair | wooden topping | total | 8 | steps | 2 pcs |
What are the load-bearing capabilities of steel Layher trusses and how are they tested?
How do steel Layher trusses compare in terms of cost and efficiency to other types of trusses?
What are some common applications for steel Layher trusses in construction projects?
How does steel Layher truss differ from other types of trusses?
What materials are used in the construction of Layher trusses and how are they manufactured?
What are the advantages of using steel Layher trusses in construction projects?
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997