You are here: Home » News » Stage Scaffolding » What are things to be done before erecting a scaffold?

What are things to be done before erecting a scaffold?

Publish Time: 2022-04-19     Origin: Site

What are things to be done before erecting a scaffold?

What is the first thing to be done before erecting a scaffold?

  1. No matter which kind of scaffolding is erected, the materials and processing quality used in the scaffold must meet the prescribed requirements. It is absolutely prohibited to use unqualified materials to build scaffolding to prevent accidents.

  2. General scaffolding must be built according to the scaffolding safety technical operation procedures. For high-rise scaffolding with a height above 15m, there must be design, calculation, details, erection scheme, approval by the technical leader of the next level, and written safety technical disclosure before erection.

  3. For dangerous and special lifting, lifting, hanging, socket, stacking and other shelves must also be designed and approved. Prepare separate safety technical measures, can build.

  4. After the construction team accepts the task, it must organize all personnel to carefully understand the scaffolding special safety construction organization design and safety technical measures disclosure, discuss erection methods, and send good and experienced technical personnel to be responsible for erection technical guidance and monitoring.

  5. After the erection and assembly of the acceptance scaffolding, the operation can only be carried out after the inspection and acceptance confirmation.The acceptance shall be organized by the competent leader, shelf team leader and full-time safety technicians layer by layer and layer by flow section, and fill in the acceptance sheet.


Send Us A Message