Publish Time: 2021-05-31 Origin: Site
tips or suggestions for using an aluminum mobile scaffolding
1. Check that all components are on the working position and ensure that the structure is good
2. Check whether the ground meets the conditions for tower construction and movement
3. It is recommended to install temporary guardrails during tower construction
4. The overall load-bearing capacity of the tower is 900KG, and the load-bearing capacity is 200KG per square meter. Overweight is strictly prohibited
5. The upper and lower towers must be up and down inside, and it is strictly forbidden to go up and down outside the tower
6. When moving the tower, pay attention to the power cables and equipment in the air to prevent electric shock accidents
7. During the movement of the tower, it is strictly forbidden to stand on top of the platform
8. When the tower exceeds a safe height, a wall connector should be used to connect the tower to the wall
9. The number of wall connectors can be determined according to site construction conditions, but the minimum distance between wall connectors shall not exceed 4 meters
10. All parts and components should be inspected regularly, and those damaged and rusted should be replaced in time
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997