manual hoist type | motor type | |
packing weight: | 850 | 1050 |
packing volume: | 6cbm | 7cbm |
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
10.00 m Beam(front) | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 6pcs | |||
2.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
3.00 m Beam(side) | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 0pcs | |||
2.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
4.00 m Pillar | 4 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
2.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 4pcs | |||||
beam cube | Spigotcube 289x289 | 0pcs | ||||||
Frame Tower | Spigot Sleeve Block S | 4pcs | ||||||
Steel Base S | 4pcs | |||||||
Top Section S | 4pcs | |||||||
Manual hoist,BA05 2Tons | 4pcs | |||||||
Spigot Hinge Section,Height 1m | 4pcs | |||||||
Fibre sling,BA04,2 tons 3m | 4pcs | |||||||
Long outrigger | 16pcs |
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
10.00 m Beam(front) | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 6pcs | |||
2.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
3.00 m Beam(side) | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 0pcs | |||
2.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
4.00 m Pillar | 4 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
2.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 4pcs | |||||
beam cube | Spigotcube 289x289 | 0pcs | ||||||
Frame Tower | Spigot Sleeve Block S | 4pcs | ||||||
Steel Base S | 4pcs | |||||||
Top Section S | 4pcs | |||||||
1. Dragon stage brand, Load:1000kg, 2. Chain length:25m, 3. lifting speed:4m/min, 4. 380V-3phrase-50HZ 5. Double brake 6. G100 load chain, meeting 8:1/10:1 safety factor. 7. With 0.5M 4Pin-16A Europe plug 8. waterproof: IP54 | 4pcs | |||||||
1control 8pcs, with Handle case | 1pcs | |||||||
Spigot Hinge Section,Height 1m | 4pcs | |||||||
Fibre sling,BA04,2 tons 3m | 4pcs | |||||||
Long outrigger | 16pcs |
Truss Material and Construction:
The truss will be constructed from high-quality aluminum, chosen for its lightweight yet robust nature, ensuring ease of installation and long-term durability. The truss will be comprised of standard components, allowing for modularity and future adjustments as needed. The truss will be designed to meet relevant safety standards and regulations, guaranteeing stability and safety during installation and use.
Loading Capacity:
The truss must be designed to withstand the weight of the lighting fixtures, speakers, and associated cabling. The load capacity should be calculated based on the maximum weight of equipment to be installed, taking into account factors such as wind loads and seismic considerations.
Safety Features:
Safety is paramount in any theater installation. The truss will incorporate features such as safety chains and locking mechanisms to ensure secure and stable mounting of equipment. Additionally, access points and platforms will be designed to provide safe working areas for technicians and performers.
Aesthetics:
While functionality is essential, the aesthetic appeal of the truss is also important. The truss will be finished with a powder coating that blends seamlessly with the theater's interior design.
Installation and Maintenance:
The truss will be installed by experienced professionals who are well-versed in theater rigging techniques. Proper documentation and training will be provided for future maintenance and adjustments.
Conclusion:
This lighting truss frame will be a valuable asset to the Kazakh Dram Theater in Astana. The design ensures stability, flexibility, and safety, enabling the theater to create stunning visual experiences for audiences. By incorporating industry best practices and high-quality materials, the truss will serve the theater for many years to come.
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997