When erecting high-rise scaffolding, all materials used must meet the quality requirements.
2. The high-rise scaffolding foundation must be firm, calculated before erection to meet the load requirements, erected in accordance with the construction specifications, and good drainage measures.
3. The technical requirements for the erection of scaffolding shall comply with the relevant regulations.
4. We must attach great importance to various structural measures: scissor braces, tension points, etc. should be set as required.
5. Horizontal closure: From the first step, every other step or two steps, the scaffolding or scaffolding shall be fully covered, and the scaffolding shall be laid along the length direction. And lay a long safety bottom fence every four steps between the pole and the wall.
6. Vertical closure: From the second step to the fifth step, a 1.00m-high protective-like railing and toe-guard or a net shall be set up on the inner side of the outer row pole in each step, and the protective pole (net) and the pole shall be fastened; In the fifth step and above, all safety fences or safety nets should be set up except for the protective barriers; in the streets or in densely populated areas, safety fences or safety nets should be set up on the outside from the second step.
7. Scaffolding should be 1.5m higher than the top of the building or the operating surface, and an enclosure should be added.
8. The steel pipes, fasteners, scaffold boards and connection points on the erected scaffolding shall not be removed at will. When necessary during construction, it must be approved by the person in charge of the construction site, and effective measures must be taken. After the process is completed, it will be restored immediately.
9. Before the scaffolding is used, inspection and acceptance shall be organized by the person in charge of the construction site. During the construction process, there should be professional management, inspection and warranty, and regular settlement observation should be carried out. If any abnormality is found, reinforcement measures should be taken in time.
10. When the scaffolding is dismantled, the connection with the building should be checked first, and the remaining materials and sundries on the scaffolding should be cleaned up. The materials should be uniformly transferred down or hoisted to the ground, and cleaned one step at a time. It is not allowed to use the step-by-step method of dismantling, and it is strictly forbidden to throw it down or dismantle it by pushing (pulling) down.
11. When erecting and dismantling scaffolding, a warning area should be set up, and special personnel should be sent to guard. In case of strong winds above level 6 and bad weather, the erection and dismantling of scaffolding should be stopped.
12. For the requirements of the foundation, if the foundation is uneven, please use the feet that can be weighed to achieve balance. The foundation must be able to withstand the pressure of scaffolding and work.
13. The staff must wear seat belts during construction and high-altitude work. Please install safety nets around the work area to prevent heavy objects from falling and injuring others.
14. The components and accessories of the scaffolding are strictly prohibited from being seriously dropped or bumped during transportation and storage; when overlapping or disassembling, it is strictly forbidden to drop them from a high place.
15. Pay attention to safety during use. It is strictly forbidden to play and play on the shelf to prevent accidents.
16. While work is important, safety and life are more important. Please keep the above in mind.