packing weight: 2750kg
packing volume: 13cbm
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
14.00 m Beam(front) | 2 sets | 3.00 m | 50×3.0 | CS389×389 | 8pcs | |||
2.00 m | 50×3.0 | CS389×389 | 2pcs | |||||
1.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
10.00 m Beam(side) | 2 sets | 3.00 m | 50×3.0 | CS389×389 | 6pcs | |||
2.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
1.00 m | 50×3.0 | CS389×389 | 2pcs | |||||
11.00 m Pillar | 4 sets | 3.00 m | 50×3.0 | CS289×289 | 12pcs | |||
2.00 m | 50×3.0 | CS289×289 | 4pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
beam cube | Spigot cube 389x389 | 0pcs | ||||||
Frame Tower | Spigot Sleeve Block S | 4pcs | ||||||
Steel Base S | 4pcs | |||||||
Top Section S | 4pcs | |||||||
1. Dragon stage brand, Load:1000kg, 2. Chain length:25m, 3. lifting speed:4m/min, 4. 380V-3phrase-50HZ 5. Double brake 6. G100 load chain, meeting 8:1/10:1 safety factor. 7. With 0.5M 4Pin-16A Europe plug 8. waterproof: IP54 | 4pcs | |||||||
1control 8pcs, with Handle case | 1pcs | |||||||
Spigot Hinge Section,Height 1m | 4pcs | |||||||
Fibre sling,BA04,2 tons 3m | 4pcs | |||||||
Long outrigger | 16pcs | |||||||
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
Roof Pillar | 2 sets | 1.40 m | 50×3.0 | CS289×289 | 2pcs | |||
10.00 m Top Beam | 1 sets | 3.00 m | 50×3.0 | CS289×289 | 3pcs | |||
2.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 1pcs | |||||
7.20 m Oblique Beam | 4 sets | 3.00 m | 50×3.0 | CS289×289 | 4pcs | |||
2.00 m | 50×3.0 | CS289×289 | 4pcs | |||||
2.20 m | 50×3.0 | CS289×289 | 4pcs | |||||
7.20 m Ladder truss | 8 sets | 3.00 m | 50×3.0 | CL30,289*50 | 8pcs | |||
2.00 m | 50×3.0 | CL30,289*50 | 8pcs | |||||
2.20 m | 50×3.0 | CL30,289*50 | 8pcs | |||||
Roof Components | roof conner 4 ways, use for roof beam truss | CS289×289 | 2pcs | |||||
roof conner 5 ways, use for roof beam truss | CS289×289 | 0pcs | ||||||
Connect plate with clamp | 2pcs | |||||||
Single clamp | 16pcs | |||||||
Double clamp | 8pcs | |||||||
roof canopy material:pvc, Blue Colour or customized. | 241.36 | 1pcs | ||||||
Item | Specification(squre truss) | Qty | ||||||
length | main tube(mm) | size(mm) | ||||||
3.00 m Wings Beam | 2 sets | 3.00 m | 50×3.0 | CS389×389 | 2pcs | |||
2.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
1.00 m | 50×3.0 | CS389×389 | 0pcs | |||||
11.00 m Wings Pillar | 2 sets | 3.00 m | 50×3.0 | CS289×289 | 6pcs | |||
2.00 m | 50×3.0 | CS289×289 | 2pcs | |||||
1.00 m | 50×3.0 | CS289×289 | 0pcs | |||||
Wings Tower | Spigot Sleeve Block S | 2pcs | ||||||
Steel Base S | 2pcs | |||||||
Top Section S | 2pcs | |||||||
1. Dragon stage brand, Load:1000kg, 2. Chain length:25m, 3. lifting speed:4m/min, 4. 380V-3phrase-50HZ 5. Double brake 6. G100 load chain, meeting 8:1/10:1 safety factor. 7. With 0.5M 4Pin-16A Europe plug 8. waterproof: IP54 | 2pcs | |||||||
Spigot Hinge Section,Height 1m | 2pcs | |||||||
Fibre sling,BA04,2 tons 3m | 2pcs | |||||||
Long outrigger | 8pcs | |||||||
Truss Accessory | Conical coupler & Safrty clip & pin | whole set |
packing weight: 2200kg
packing volume: 15cbm
Item | Specification | Quantity | ||||||
Aluminium assembly stage | topping: 4x8ft (1.22x2.44m) | wooden | 35 pcs | |||||
1.22m stage brace | 42 pcs | |||||||
2.44m stage brace | 40 pcs | |||||||
stand with extendable tube | 48 pcs | |||||||
Stage adjustable base | 48 pcs | |||||||
Stage Stair | wooden topping | total | 8 | steps | adjustable to the stage height | 2 pcs |
How Stage Constructed for Kinshasa Maajabu Mike Kalambay - Live Explo Célébration on 27th 2024
Mike Kalambay - Live Explo Célébration Successully Held on 27th, 2024
What Are The Key Factors To Consider When Choosing between Wood And Plastic for A Flight Case?
What Are the Differences between The Mobile Stage and Foldable Stage?
FOSHAN DRAGON STAGE
No.7,Xiaxi Industrial Area,Heshun,Nanhai District,Foshan,528241,Guangdong,China.
+86 136 3132 8997